Diagnose before you dig
Photograph standing water after every storm for a full season. Patterns emerge quickly and drive the right design.
Fix the outfall first
There is no point installing collector drains if the outfall cannot cope. Design starts at the discharge point, not the collection point.
Phase in priority order
Fairways first, greens surrounds second, bunker floors third. Path edges are addressed within pathway programmes.
Related expertise
